IBIS Macromodel Task Group

Meeting date: 10 January 2023

Members (asterisk for those attending):
Achronix Semiconductor:       Hansel Dsilva
Amazon:                       John Yan
ANSYS:                      * Curtis Clark
                            * Wei-hsing Huang
Aurora Systems:             * Dian Yang
Cadence Design Systems:     * Ambrish Varma
                              Jared James
Google:                       Hanfeng Wang
                              GaWon Kim
Intel:                      * Michael Mirmak
                              Kinger Cai
                            * Chi-te Chen
                              Alaeddin Aydiner
Keysight Technologies:        Fangyi Rao
                              Majid Ahadi Dolatsara
                              Ming Yan
                              Radek Biernacki
                              Rui Yang
Luminous Computing            David Banas
Marvell                       Steve Parker
Mathworks (SiSoft):         * Walter Katz
                              Mike LaBonte
Micron Technology:          * Randy Wolff
                            * Justin Butterfield
Missouri S&T                  Chulsoon Hwang
                              Yifan Ding
Rivos                         Yansheng Wang
SAE ITC                       Michael McNair
Siemens EDA (Mentor):       * Arpad Muranyi
Teraspeed Labs:             * Bob Ross
Waymo:                        Zhiping Yang
Zuken USA:                  * Lance Wang

The meeting was led by Arpad Muranyi.  Curtis Clark took the minutes.

--------------------------------------------------------------------------------
Opens:

- Status of regularly scheduled upcoming meetings:
  - January 17, 2023 - will be held
  - January 24, 2023 - tentatively, will be held
  - January 31, 2023 - cancelled - week of DesignCon

-------------
Review of ARs:
  
- Kinger to send out draft7 of the SPIM BIRD containing changes reviewed and
  discussed at the last meeting.
  - Done.

--------------------------
Call for patent disclosure:

- None.

-------------------------
Review of Meeting Minutes:

Arpad asked for any comments or corrections to the minutes of the December 20th
meeting.  Michael moved to approve the minutes.  Randy seconded the motion.
There were no objections.

--------------
New Discussion:

Standard Power Integrity Model (SPIM) BIRD draft:
Chi-te said she had not received any feedback since Kinger had sent out draft7.
No one in attendance had any new feedback.  Arpad asked everyone to review
draft7 and provide feedback.

Modify C_comp model for T-coil modeling:
Walter reported that this topic had come from a customer engagement.  He said he
was waiting for the customer to verify that it is important.  Walter moved to
table the topic.  Bob seconded the motion.  There were no objections.

AMI Support for [Test Data]/[Test Load]:
Proposal for a new keyword:  [Clock Group]:
Michael reported that he plans to work on BIRDs for these two topics, but it
will not happen soon.  He asked that these topics stay on the agenda and not be
tabled.

Multi-level analog buffer modeling (PAMn, C-phy, etc.):
Arpad summarized previous discussions, which he had started several months ago.
He recalled that there had been differences of opinion as to whether this
enhancement to analog modeling was necessary and how much work it would entail.
He said Randy had suggested that the simplest solution might be to define a
stimulus input scheme that allows for multi-level signaling.  Arpad said he
would eventually like to continue discussion on this topic, but he had no new
updates.

- Curtis: Motion to adjourn.
- Michael: Second.
- Arpad: Thank you all for joining.

-------------
Next meeting: 17 January 2023 12:00pm PT
-------------

IBIS Interconnect SPICE Wish List:

1) Simulator directives
